{"lastUpdated":"2026-04-11","blockers":[{"id":"MAT-001","title":"30mm plates (30x8000x2000) shortage","priority":"CRITICAL","deadline":"2026-04-04","status":"completed","assignee":"Yalova Shipyard","notes":"RESOLVED 2026-04-11 — plates delivered/sourced, steel construction unblocked"},{"id":"MAT-002","title":"5mm steel plates for ventilation ducts","priority":"HIGH","deadline":"2026-04-07","status":"completed","assignee":"Yalova Shipyard","notes":"RESOLVED 2026-04-11 — plates delivered, vent duct fabrication unblocked"},{"id":"DWG-001","title":"CNC/nesting files for ventilation duct bending","priority":"CRITICAL","deadline":"2026-04-05","status":"completed","assignee":"BLUE LINE","notes":"RESOLVED 2026-04-11 — CNC/nesting files received from Blue Line"},{"id":"DWG-002","title":"Welding seam details for vent ducts O1250","priority":"CRITICAL","deadline":"2026-04-05","status":"completed","assignee":"BLUE LINE","notes":"RESOLVED 2026-04-11 — welding seam details received from Blue Line"},{"id":"DWG-003","title":"Chamfer detail for pillar arrangement (30mm/15mm junction)","priority":"HIGH","deadline":"2026-04-07","status":"completed","assignee":"BLUE LINE","notes":"RESOLVED 2026-04-11 — chamfer detail received from Blue Line"},{"id":"DWG-004","title":"Deck 2 profile drawing RINA approval (ISST/21978)","priority":"HIGH","deadline":"2026-04-10","status":"completed","assignee":"RINA / BLUE LINE","notes":"[2026-04-13] Email from Blue Line: SIGNED_APPROVED | [2026-04-13] Email from Georges Iskandar: SIGNED_APPROVED | [2026-04-13] Email from Muhammet Arslan: SIGNED_APPROVED | APPROVED 2026-04-11 — All profile deck drawings (Decks 2-6) now RINA approved"},{"id":"DWG-005","title":"Profile Decks 7-11 drawings not yet received","priority":"CRITICAL","deadline":"2026-04-12","status":"completed","assignee":"BLUE LINE","notes":"[2026-04-13] Email from Blue Line: SIGNED_APPROVED | [2026-04-13] Email from Georges Iskandar: SIGNED_APPROVED | [2026-04-13] Email from Muhammet Arslan: SIGNED_APPROVED | RESOLVED 2026-04-11 — All deck drawings received and approved by RINA"},{"id":"DWG-006","title":"Bilge/Ballast system design package","priority":"HIGH","deadline":"2026-04-20","status":"in_progress","assignee":"Yalova Shipyard / Master","notes":"[2026-04-13] Email from Muhammet Arslan: MEETING | Blue Line drawings received but had errors. Master corrected them. Shipyard now applying the corrected design. Updated 2026-04-11","_daysLeft":7,"_isOverdue":false},{"id":"DWG-007","title":"Fire fighting system design package","priority":"HIGH","deadline":"2026-05-01","status":"pending_approval","assignee":"RINA","notes":"[2026-04-13] Email from Muhammet Arslan: MEETING | BLU169-308 (fire fighting & deck washing) + BLU169-310 (CO2 fire fighting) submitted to RINA on 2026-04-09 as part of 57-drawing package. Awaiting RINA approval","_daysLeft":18,"_isOverdue":false},{"id":"DWG-008","title":"Cargo ramp structural detail drawings","priority":"MEDIUM","deadline":"2026-04-15","status":"in_progress","assignee":"Yalova Shipyard","notes":"[2026-04-13] Email from Muhammet Arslan: MEETING | Review complete, drawings accepted. Now with shipyard for fabrication. Updated 2026-04-11","_daysLeft":2,"_isOverdue":false},{"id":"QUO-001","title":"Hot dip galvanized quotation for ER ventilation louver","priority":"HIGH","deadline":"2026-04-02","status":"completed","assignee":"Veta (Turkey)","notes":"[2026-04-13] Email from Busra Yildiz: NEW_QUOTATION | [2026-04-13] Email from Gizem: NEW_QUOTATION | [2026-04-13] Email from Mustafa Yilmaz: NEW_QUOTATION | RESOLVED 2026-04-11 — louver supplied by Veta (Turkey). Funnels/hoods being sandblasted and cut to fit"},{"id":"PROC-001","title":"Free-fall lifeboat procurement decision","priority":"HIGH","deadline":null,"status":"in_progress","assignee":"Jimmy Iskandar","notes":"Comparing 5 suppliers: (1) Ningbo New Marine — NM67FC(27P)+70KN davit USD 64,800, quote received Apr 1. (2) Fountom (Ann Zhang, Chongqing) — quote+drawings received Apr 10, EC cert, 2 delivery options. (3) Gepa Fiberglass (Istanbul) — G-FFF1+G-RB1, quote via Mustafa Apr 9, Turkish supplier. (4) Deyuan Equipment (Summer, Nanning) — 27P/30P accepted, RINA-MED/EC, proposal coming. (5) Norma (Sarah) — RFQ follow-up sent Apr 9, awaiting quote. Also need 6-person rescue boat + davit. Updated 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"PROC-002","title":"SKV equipment dimension confirmation (dwg 90302-50K-129)","priority":"LOW","deadline":"2026-04-09","status":"in_progress","assignee":"Peru Monasterio / SKV","notes":"Not top urgent — most livestock equipment already purchased. Ventilation fans from Elbeco, feeding system from Falconi. Dimension confirmation still pending","_daysLeft":-4,"_isOverdue":true},{"id":"PROC-003","title":"SKV livestock equipment lead time (3-4 months ex-China)","priority":"LOW","deadline":"2026-04-15","status":"in_progress","assignee":"Jimmy Iskandar","notes":"Most equipment already being bought — fans from Elbeco, feeding system from Falconi. Remaining items on order, not urgent","_daysLeft":2,"_isOverdue":false},{"id":"PROC-004","title":"Paint supply — Hempel","priority":"MEDIUM","deadline":null,"status":"in_progress","assignee":"Hempel","notes":"Paint sourced from Hempel. Added 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"PROC-005","title":"Anti-slip flooring for livestock decks","priority":"MEDIUM","deadline":null,"status":"in_progress","assignee":"Jimmy Iskandar","notes":"Testing granite and basalt aggregate mixed with Hempel paint. Sourcing both for comparison testing. Added 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"PROC-006","title":"Watering system for livestock decks","priority":"HIGH","deadline":null,"status":"in_progress","assignee":"Captain / Yalova Shipyard","notes":"[2026-04-13] Email from Muhammet Arslan: MEETING | Drawing under review by captain and shipyard — modifications being made. Deciding between steel or plastic piping. Sourcing options being revised. Added 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"PROC-007","title":"Drainage/waste system for livestock decks","priority":"HIGH","deadline":null,"status":"in_progress","assignee":"Yalova Shipyard","notes":"System being checked on the ground now. Will be revised. Added 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"PROC-008","title":"Generators — 3x Volvo Penta","priority":"HIGH","deadline":null,"status":"in_progress","assignee":"Jimmy Iskandar","notes":"Agreed on 3 Volvo Penta generators. Added 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"PROC-009","title":"Navigation/bridge equipment inspection","priority":"LOW","deadline":"2026-04-30","status":"pending","assignee":"Gilbert","notes":"Gilbert to check this month. Mainly everything OK. Added 2026-04-11","_daysLeft":17,"_isOverdue":false},{"id":"DWG-009","title":"Hatch end beam connection detail Decks 2-5 — T-Bar vs L-profile discrepancy","priority":"HIGH","deadline":null,"status":"open","assignee":"BLUE LINE","notes":"[2026-04-13] Email from Blue Line: URGENT | [2026-04-13] Email from Blue Line: SIGNED_APPROVED | [2026-04-13] Email from Georges Iskandar: SIGNED_APPROVED | [2026-04-13] Email from Georges Iskandar: URGENT | [2026-04-13] Email from Muhammet Arslan: SIGNED_APPROVED | Muhammet ARSLAN flagged 2026-04-11: drawings specify T-Bar but actual ship has L-profile (Angle Bar). Blue Line must revise. Waiting their response","_daysLeft":null,"_isOverdue":false},{"id":"DWG-010","title":"CNC re-nesting Decks 8-10 for actual plate dimensions","priority":"HIGH","deadline":null,"status":"open","assignee":"BLUE LINE","notes":"Muhammet ARSLAN flagged 2026-04-10: CNC codes set for 10x12000x2500mm but actual plates are 2000x8000mm. Decks 2-7 already cut. Blue Line must re-nest Decks 8, 9, 10. Waiting their response","_daysLeft":null,"_isOverdue":false},{"id":"DWG-011","title":"Fodder pipeline layout — needs major revision","priority":"HIGH","deadline":null,"status":"open","assignee":"Jimmy Iskandar / BLUE LINE","notes":"[2026-04-13] Email from Blue Line: SIGNED_APPROVED | [2026-04-13] Email from Georges Iskandar: SIGNED_APPROVED | [2026-04-13] Email from Muhammet Arslan: SIGNED_APPROVED | Blue Line completed arrangement on frames 35,43,54,67,75,91,107,123,139,147 (BLU169-100.000.001A). NOT approved — needs a lot of revision. Blue Line asked twice but layout not acceptable yet. Updated 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"RINA-001","title":"RINA approval — 57 drawings submitted 2026-04-09","priority":"CRITICAL","deadline":null,"status":"pending_approval","assignee":"RINA","notes":"[2026-04-13] Email from Blue Line: URGENT | [2026-04-13] Email from Blue Line: SIGNED_APPROVED | [2026-04-13] Email from Muhammet Arslan: MEETING | [2026-04-13] Email from Georges Iskandar: SIGNED_APPROVED | [2026-04-13] Email from Georges Iskandar: URGENT | [2026-04-13] Email from Muhammet Arslan: SIGNED_APPROVED | Blue Line submitted full technical package to RINA on 2026-04-09. 57 drawings including: technical description, GA, tonnage, stability, freeboard, fire & safety plan, structural fire protection, capacity, visibility, damage stability, escape route, damage control, midship section, bulkheads, shell expansion, profile decks 1-11, pillars, ventilation ducts, NDT, sewage tanks, genset compartment, cranes foundations, welding table, doors/hatches, manholes, cargo ramps, stanchions/rails, tank testing, accommodation sewage, FO system, fire fighting, CO2, drainage cargo area, ventilation cargo area, FW production, genset cooling/FO/exhaust/ventilation, sewage discharge calc, equipment number calc, single line diagram, energy power balance main+secondary, lighting cargo area. MUST TRACK ALL APPROVALS","_daysLeft":null,"_isOverdue":false},{"id":"QUO-002","title":"Anti-heeling tank piping quotation — price negotiation","priority":"HIGH","deadline":null,"status":"open","assignee":"Georges Iskandar / Yalova Shipyard","notes":"[2026-04-13] Email from Busra Yildiz: NEW_QUOTATION | [2026-04-13] Email from Gizem: NEW_QUOTATION | [2026-04-13] Email from Mustafa Yilmaz: NEW_QUOTATION | Muhammet sent pipe routing + calculation + tariff Apr 6. 3 reminders sent (Apr 6,7,8). CRITICAL — piping must be done before cement application. Still negotiating price. Muhammet addressing Georges. Updated 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"QUO-003","title":"Fore Peak Tank & Fuel Tanks PS/STB grit blasting & painting","priority":"HIGH","deadline":null,"status":"open","assignee":"Georges Iskandar / Yalova Shipyard","notes":"[2026-04-13] Email from Busra Yildiz: NEW_QUOTATION | [2026-04-13] Email from Gizem: NEW_QUOTATION | [2026-04-13] Email from Mustafa Yilmaz: NEW_QUOTATION | Muhammet sent quotation Apr 8. Still negotiating price. Updated 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"PROC-010","title":"Class B-15 fire-rated doors — Ensar Gemi","priority":"MEDIUM","deadline":null,"status":"completed","assignee":"Mustafa Yilmaz","notes":"DONE — 700x1900mm Class B-15 doors (left+right), stainless steel frame, RAL 7040 grey. Supplier: Ensar Gemi (Necmettin Bakkal). Proforma REV1 accepted, payment confirmed upfront. Production to start upon payment receipt. Updated 2026-04-11"},{"id":"DWG-012","title":"Deck 11 workshop drawings (modules 1101-1108) — awaiting revision","priority":"MEDIUM","deadline":null,"status":"open","assignee":"BLUE LINE","notes":"[2026-04-13] Email from Blue Line: SIGNED_APPROVED | [2026-04-13] Email from Georges Iskandar: SIGNED_APPROVED | [2026-04-13] Email from Muhammet Arslan: SIGNED_APPROVED | Blue Line sent profile sketches Apr 8. Awaiting revision. Updated 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"PROC-011","title":"Equipment transfer — compressors, FW generator, diesel generators","priority":"CRITICAL","deadline":"2026-04-15","status":"in_progress","assignee":"Yalova Shipyard","notes":"Solution found: cut shell plate opening for equipment transfer, keep open until all equipment in. Avoids Deck 4 panel closing constraint. Compressor room equipment + FW generator + 3x Volvo Penta generators to go through. Updated 2026-04-11","_daysLeft":2,"_isOverdue":false},{"id":"DWG-013","title":"Drainage system revisions per Yalova comments","priority":"HIGH","deadline":null,"status":"open","assignee":"BLUE LINE","notes":"Muhammet comments Apr 6: (1) Deck 6 Fr28-29 remove 2 pumps, gravity only. (2) No overboard — bilge to sewage tank in cargo hold. (3) All bilge connections 150mm diameter. (4) Below Deck 5 overboard connections loop up to Deck 5. (5) Clarify flanged vs welded connections on drawing. Updated 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"DWG-014","title":"Welding table/sequence update","priority":"MEDIUM","deadline":null,"status":"open","assignee":"QA/QC / Design","notes":"[2026-04-13] Email from Georges Iskandar: MEETING | [2026-04-13] Email from Muhammet Arslan: MEETING | From Mar 25 meeting. Still negotiating and revising. Updated 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"DWG-015","title":"Piping P&IDs and isometrics — fodder, fire, FW, bilge","priority":"HIGH","deadline":null,"status":"open","assignee":"BLUE LINE","notes":"[2026-04-13] Email from Georges Iskandar: MEETING | [2026-04-13] Email from Muhammet Arslan: MEETING | From Mar 25 meeting. All under revision. General plans submitted to RINA but detailed P&IDs/isometrics for fabrication still being revised. Updated 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"DWG-016","title":"Switchboard Room & MCR — location and layout drawing","priority":"HIGH","deadline":null,"status":"open","assignee":"BLUE LINE","notes":"Switchboard and Motor Control Room combined. Waiting on drawing for aft location. Probably above the generator room in the aft. Need RINA approval if installed power >100KWe. Updated 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"DWG-017","title":"Generator Room layout drawing","priority":"HIGH","deadline":null,"status":"open","assignee":"BLUE LINE","notes":"3x Volvo Penta agreed. Waiting on Blue Line for room layout/foundation drawing. Updated 2026-04-11","_daysLeft":null,"_isOverdue":false},{"id":"PROC-012","title":"3x Hose Cranes — Veta Gemi","priority":"MEDIUM","deadline":null,"status":"in_progress","assignee":"Veta Gemi","notes":"[2026-04-13] Email from Blue Line: SIGNED_APPROVED | [2026-04-13] Email from Georges Iskandar: SIGNED_APPROVED | [2026-04-13] Email from Muhammet Arslan: SIGNED_APPROVED | 3x HBFBC80 Hose Crane 3t@15m. SWL: 5t (3-7m), 3t (7-15m). All AH36 steel. RINA approved ISST/0000022207 (11 Mar 2026, replaces ISST/21653). Drawing HB001-HB014. Boom 3075kg, Hook 250kg. Being manufactured by Veta Gemi, Turkey. Added 2026-04-11","_daysLeft":null,"_isOverdue":false}],"workStreams":[{"name":"Steel Construction","status":"blocked","details":"Decks 2-9 fabrication. Materials ready. Timeline managed by Yalova Shipyard. Decks 2-7 plates cut. Decks 8-10 awaiting CNC re-nesting from Blue Line. Updated 2026-04-11","autoUpdated":true},{"name":"Profile Deck Drawings","status":"completed","details":"All profile deck drawings (Decks 2-11) received from Blue Line and approved by RINA as of 2026-04-11"},{"name":"Ventilation Ducts","status":"in_progress","details":"Rev.02 received Apr 7 — diameters 19-24 changed from 1250mm to 1100mm. Welding detail received (FB 50x6 backing support). Yalova suggests FB 40x4 instead — waiting Blue Line confirmation. Nesting drawings need revision for updated diameters. Updated 2026-04-11"},{"name":"Cargo Ramps","status":"in_progress","details":"Drawings approved, now with Yalova Shipyard for fabrication. Updated 2026-04-11"},{"name":"Pillar Arrangements","status":"in_progress","details":"Chamfer detail RESOLVED 2026-04-11. Pillar fabrication can proceed"},{"name":"Bilge/Ballast Systems","status":"in_progress","details":"Blue Line drawings had errors — Master corrected. Shipyard now applying corrected design. Updated 2026-04-11"},{"name":"Fire Fighting Systems","status":"pending_approval","details":"BLU169-308 + BLU169-310 submitted to RINA 2026-04-09. Awaiting RINA approval"},{"name":"Lifeboat/Davit","status":"blocked","details":"Ningbo quote USD 64,800. Waiting for additional offers before deciding","autoUpdated":true},{"name":"ER Ventilation Louver","status":"in_progress","details":"Louver from Veta (Turkey). Funnels/hoods being sandblasted and cut to fit. Updated 2026-04-11"},{"name":"SKV Livestock Equipment","status":"in_progress","details":"Most equipment already purchased — ventilation fans from Elbeco, feeding system from Falconi. SKV dimension confirmation still pending but not urgent"}],"newDrawings":[{"id":"LB-GA-001","filename":"GA NM67FC.pdf","title":"NM67FC 27-Person Free-Fall Lifeboat GA","source":"Ningbo New Marine","received":"2026-04-01","category":"lifeboat"},{"id":"LB-SPEC-001","filename":"SPEC NM67FC(27P).docx","title":"NM67FC(27P) Lifeboat Specification","source":"Ningbo New Marine","received":"2026-04-01","category":"lifeboat"},{"id":"LB-GA-002","filename":"GA 70KN抛落架.pdf","title":"70KN Free-Fall Launching Davit GA","source":"Ningbo New Marine","received":"2026-04-01","category":"lifeboat"},{"id":"LB-SPEC-002","filename":"SPEC 70KN抛落架 REV.1.docx","title":"70KN Davit Specification Rev.1","source":"Ningbo New Marine","received":"2026-04-01","category":"lifeboat"},{"id":"AUTO-1775916315305-0","filename":"BLU169-200.000.002- Midship Section.pdf","title":"BLU169-200.000.002- Midship Section","source":"Auto-detected","received":"2026-04-08","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-1","filename":"BLU169-204.000.003 - Profile decks - Deck no.2 (1).dwg","title":"BLU169-204.000.003 - Profile decks - Deck no.2 (1)","source":"Auto-detected","received":"2026-04-08","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-2","filename":"BLU169-204.000.003 - Profile decks - Deck no.2 (1).pdf","title":"BLU169-204.000.003 - Profile decks - Deck no.2 (1)","source":"Auto-detected","received":"2026-04-08","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-3","filename":"BLU169-204.000.003 - Profile decks - Deck no.2.dwg","title":"BLU169-204.000.003 - Profile decks - Deck no.2","source":"Auto-detected","received":"2026-04-08","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-4","filename":"BLU169-204.000.003 - Profile decks - Deck no.2.pdf","title":"BLU169-204.000.003 - Profile decks - Deck no.2","source":"Auto-detected","received":"2026-04-08","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-5","filename":"BLU169-205.000.002 - Profile decks - Deck no.3 . Approved.pdf","title":"BLU169-205.000.002 - Profile decks - Deck no.3 . Approved","source":"Auto-detected","received":"2026-04-08","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-6","filename":"BLU169-205.000.002 - Profile decks - Deck no.3.dwg","title":"BLU169-205.000.002 - Profile decks - Deck no.3","source":"Auto-detected","received":"2026-04-08","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-7","filename":"BLU169-206.000.002 - Profile decks - Deck no.4 . Approved.pdf","title":"BLU169-206.000.002 - Profile decks - Deck no.4 . Approved","source":"Auto-detected","received":"2026-04-08","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-8","filename":"BLU169-206.000.002 - Profile decks - Deck no.4.dwg","title":"BLU169-206.000.002 - Profile decks - Deck no.4","source":"Auto-detected","received":"2026-04-08","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-9","filename":"BLU169-207.000.001 - Profile decks - Deck no.5. Approved.pdf","title":"BLU169-207.000.001 - Profile decks - Deck no.5. Approved","source":"Auto-detected","received":"2026-04-08","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-10","filename":"BLU169-207.000.001 - Profile decks - Deck no.5.dwg","title":"BLU169-207.000.001 - Profile decks - Deck no.5","source":"Auto-detected","received":"2026-04-08","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-11","filename":"BLU169-208.000.001 - Profile decks - Deck no.6.Approved.pdf","title":"BLU169-208.000.001 - Profile decks - Deck no.6.Approved","source":"Auto-detected","received":"2026-04-08","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-12","filename":"BLU169-208.000.001 - Profile decks - Deck no.6.dwg","title":"BLU169-208.000.001 - Profile decks - Deck no.6","source":"Auto-detected","received":"2026-04-08","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-13","filename":"BLU169-214.000.000 - Pillar Arrangement.dwg","title":"BLU169-214.000.000 - Pillar Arrangement","source":"Auto-detected","received":"2026-04-08","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-14","filename":"BLU169-204.000.003 - Profile decks - Deck no.2.dwg","title":"BLU169-204.000.003 - Profile decks - Deck no.2","source":"Auto-detected","received":"2026-04-02","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-15","filename":"BLU169-204.000.003 - Profile decks - Deck no.2.pdf","title":"BLU169-204.000.003 - Profile decks - Deck no.2","source":"Auto-detected","received":"2026-04-02","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-16","filename":"BLU169-205.000.002 - Profile decks - Deck no.3 . Approved.pdf","title":"BLU169-205.000.002 - Profile decks - Deck no.3 . Approved","source":"Auto-detected","received":"2026-04-02","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-17","filename":"BLU169-205.000.002 - Profile decks - Deck no.3.dwg","title":"BLU169-205.000.002 - Profile decks - Deck no.3","source":"Auto-detected","received":"2026-04-02","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-18","filename":"BLU169-206.000.002 - Profile decks - Deck no.4 . Approved.pdf","title":"BLU169-206.000.002 - Profile decks - Deck no.4 . Approved","source":"Auto-detected","received":"2026-04-02","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-19","filename":"BLU169-206.000.002 - Profile decks - Deck no.4.dwg","title":"BLU169-206.000.002 - Profile decks - Deck no.4","source":"Auto-detected","received":"2026-04-02","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-20","filename":"BLU169-207.000.001 - Profile decks - Deck no.5. Approved.pdf","title":"BLU169-207.000.001 - Profile decks - Deck no.5. Approved","source":"Auto-detected","received":"2026-04-02","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-21","filename":"BLU169-207.000.001 - Profile decks - Deck no.5.dwg","title":"BLU169-207.000.001 - Profile decks - Deck no.5","source":"Auto-detected","received":"2026-04-02","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-22","filename":"BLU169-208.000.001 - Profile decks - Deck no.6.Approved.pdf","title":"BLU169-208.000.001 - Profile decks - Deck no.6.Approved","source":"Auto-detected","received":"2026-04-02","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-23","filename":"BLU169-208.000.001 - Profile decks - Deck no.6.dwg","title":"BLU169-208.000.001 - Profile decks - Deck no.6","source":"Auto-detected","received":"2026-04-02","category":"02 - Structural Drawings","autoDetected":true},{"id":"AUTO-1775916315305-24","filename":"BLU169 List of equipments revision 1.pdf","title":"BLU169 List of equipments revision 1","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-25","filename":"BLU169-100.000.001A-General arrangement page 2.pdf","title":"BLU169-100.000.001A-General arrangement page 2","source":"Auto-detected","received":"2026-03-19","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-26","filename":"BLU169-200.000.002- Midship Section.pdf","title":"BLU169-200.000.002- Midship Section","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-27","filename":"BLU169-214.000.000 - Pillar Arrangement.dwg","title":"BLU169-214.000.000 - Pillar Arrangement","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-28","filename":"BLU169-306.000.000- Bilge and ballast system modification-Model.pdf","title":"BLU169-306.000.000- Bilge and ballast system modification-Model","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-29","filename":"BLU169-308.000.000-Modification fire fighting and deck washing system-Model.pdf","title":"BLU169-308.000.000-Modification fire fighting and deck washing system-Model","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-30","filename":"BLU169-309.000.000-Air, Sounding and filling system-Model.pdf","title":"BLU169-309.000.000-Air, Sounding and filling system-Model","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-31","filename":"BLU169-312.000.000-Drainage System for livestock area-Model.pdf","title":"BLU169-312.000.000-Drainage System for livestock area-Model","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-32","filename":"BLU169 - Marinaland Conversion Equipment & Systems.xlsx","title":"BLU169 - Marinaland Conversion Equipment & Systems","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-33","filename":"BLU169 List of equipments revision 1.pdf","title":"BLU169 List of equipments revision 1","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-34","filename":"BLU169-306.000.000- Bilge and ballast system modification-Model.pdf","title":"BLU169-306.000.000- Bilge and ballast system modification-Model","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-35","filename":"BLU169-308.000.000-Modification fire fighting and deck washing system-Model.pdf","title":"BLU169-308.000.000-Modification fire fighting and deck washing system-Model","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-36","filename":"BLU169-309.000.000-Air, Sounding and filling system-Model.pdf","title":"BLU169-309.000.000-Air, Sounding and filling system-Model","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-37","filename":"BLU169-312.000.000-Drainage System for livestock area-Model.pdf","title":"BLU169-312.000.000-Drainage System for livestock area-Model","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-38","filename":"BLU169-200.000.002- Midship Section.pdf","title":"BLU169-200.000.002- Midship Section","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-39","filename":"BLU169-204.000.003 - Profile decks - Deck no.2 (1).dwg","title":"BLU169-204.000.003 - Profile decks - Deck no.2 (1)","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-40","filename":"BLU169-204.000.003 - Profile decks - Deck no.2 (1).pdf","title":"BLU169-204.000.003 - Profile decks - Deck no.2 (1)","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-41","filename":"BLU169-204.000.003 - Profile decks - Deck no.2.dwg","title":"BLU169-204.000.003 - Profile decks - Deck no.2","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-42","filename":"BLU169-204.000.003 - Profile decks - Deck no.2.pdf","title":"BLU169-204.000.003 - Profile decks - Deck no.2","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-43","filename":"BLU169-205.000.002 - Profile decks - Deck no.3 . Approved.pdf","title":"BLU169-205.000.002 - Profile decks - Deck no.3 . Approved","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-44","filename":"BLU169-205.000.002 - Profile decks - Deck no.3.dwg","title":"BLU169-205.000.002 - Profile decks - Deck no.3","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-45","filename":"BLU169-206.000.002 - Profile decks - Deck no.4 . Approved.pdf","title":"BLU169-206.000.002 - Profile decks - Deck no.4 . Approved","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-46","filename":"BLU169-206.000.002 - Profile decks - Deck no.4.dwg","title":"BLU169-206.000.002 - Profile decks - Deck no.4","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-47","filename":"BLU169-207.000.001 - Profile decks - Deck no.5. Approved.pdf","title":"BLU169-207.000.001 - Profile decks - Deck no.5. Approved","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-48","filename":"BLU169-207.000.001 - Profile decks - Deck no.5.dwg","title":"BLU169-207.000.001 - Profile decks - Deck no.5","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-49","filename":"BLU169-208.000.001 - Profile decks - Deck no.6.Approved.pdf","title":"BLU169-208.000.001 - Profile decks - Deck no.6.Approved","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-50","filename":"BLU169-208.000.001 - Profile decks - Deck no.6.dwg","title":"BLU169-208.000.001 - Profile decks - Deck no.6","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-51","filename":"BLU169-214.000.000 - Pillar Arrangement.dwg","title":"BLU169-214.000.000 - Pillar Arrangement","source":"Auto-detected","received":"2026-04-08","category":"05 - Conversion Drawings (BLU169)","autoDetected":true},{"id":"AUTO-1775916315305-52","filename":"GA  70KN抛落架.pdf","title":"GA  70KN抛落架","source":"Auto-detected","received":"2026-04-08","category":"07 - Certificates and Documents","autoDetected":true},{"id":"AUTO-1775916315305-53","filename":"GA  70KN抛落架.pdf","title":"GA  70KN抛落架","source":"Auto-detected","received":"2026-04-08","category":"12 - Quotations and Offers","autoDetected":true}],"contacts":{"shipyard":{"name":"Yalova Shipyard","planning":"Muhammet ARSLAN","email":"m.arslan@yalovashipyard.net","commercial":"Baran DEMIR","commercialEmail":"b.demir@yalovashipyard.net","technical":"Ali Ozcan BAYRAK","technicalEmail":"a.bayrak@yalovashipyard.net"},"design":{"name":"BLUE LINE Ltd.","contact":"Alina Jalba","authority":"Mr. Iorga Valeriu","email":"Technic@bluelineships.ro"},"equipment":{"name":"SKV Bermeo","contact":"Peru Monasterio","note":"Scotland/Spain offices closed Easter Apr 2-6"},"lifeboats":{"name":"Ningbo New Marine","contact":"Ludan"},"lifeboats2":{"name":"Fountom (Chongqing)","contact":"Ann Zhang","email":"sales01@fountom.com","phone":"+86 184 2618 8215","cert":"EC","note":"Quote+drawings received Apr 10"},"lifeboats3":{"name":"Gepa Fiberglass (Istanbul)","contact":"Burçin Murtezaoğlu Kutlu","email":"burcinmurtezaoglukutlu@gepafiberglass.com","phone":"+90 535 960 99 20","note":"G-FFF1+G-RB1 quote via Mustafa Apr 9"},"lifeboats4":{"name":"Deyuan Equipment (Nanning)","contact":"Summer Pang","email":"sales12@deyuanmarine.com","phone":"+86 159 7706 1711","note":"Proposal coming, 27P/30P RINA-MED/EC"},"louver":{"name":"Veta Gemi","location":"Turkey","note":"ER ventilation louver + 3x Hose Cranes (HBFBC80, 3t@15m, SWL 5t/3-7m + 3t/7-15m, AH36, RINA approved ISST/0000022207). Funnels/hoods sandblasted and cut"},"paint":{"name":"Hempel","note":"Paint supplier for vessel"},"feeding":{"name":"Falconi","note":"Feeding system supplier for livestock decks"},"fans":{"name":"Elbeco","contact":"Kayrouz","email":"kayrouz@elbecogroup.com","note":"Ventilation fans for livestock decks"},"doors":{"name":"Ensar Gemi","contact":"Necmettin Bakkal","email":"necmettin@ensargemi.com","phone":"+90 216 392 93 96","note":"Class B-15 fire-rated doors 700x1900mm, SS frame, RAL 7040"},"consultant":{"name":"Xcelerate Technologies","contact":"Ryno Uys","location":"Dubai"},"owner":{"name":"Marina Trading Inc.","jimmy":"jimmyiskandar@marinaland.net","georges":"georgesiskandar@marinaland.net","mustafa":"mustafayilmaz@marinaland.net","operations":"operations@marinaland.net","backup":"marinalandskynet@hotmail.com"}},"reportRecipients":["iskandarjimmy77@gmail.com","jimmyiskandar@marinaland.net","operations@marinaland.net","doralivestock@gmail.com","doralivestock@hotmail.com"],"alerts":[{"type":"drawing","message":"RESOLVED: All deck profile drawings (2-11) received and RINA approved as of 2026-04-11","severity":"info"},{"type":"drawing","message":"RESOLVED: DWG-001 CNC/nesting files received 2026-04-11","severity":"info"},{"type":"drawing","message":"RESOLVED: DWG-002 Welding seam details received 2026-04-11","severity":"info"},{"type":"drawing","message":"RESOLVED: DWG-003 Chamfer detail received 2026-04-11","severity":"info"},{"type":"drawing","message":"RESOLVED: Deck 2 RINA approval (ISST/21978) — approved 2026-04-11","severity":"info"},{"type":"material","message":"RESOLVED: 30mm plates delivered 2026-04-11 — steel construction unblocked","severity":"info"},{"type":"material","message":"RESOLVED: 5mm plates delivered 2026-04-11 — vent duct fabrication unblocked","severity":"info"},{"type":"supplier","message":"RESOLVED: ER vent louver galvanizing quotation received 2026-04-11","severity":"info"},{"type":"procurement","message":"Lifeboat — waiting for more offers. Ningbo quote USD 64,800 on file","severity":"medium"},{"type":"procurement","message":"SKV dimension confirmation pending — not urgent, most equipment already being purchased","severity":"low"},{"type":"schedule","message":"Schedule revised due to adverse weather, subject to further revision","severity":"medium"},{"type":"supplier","message":"SKV offices reopened after Easter (closed Apr 2-6)","severity":"info"}]}